Plant 1 - Bhosari, Pune

Notifications

View All
Band Saw Machine reported breakdown
2 min ago
CR Sheet 1.6mm below minimum stock
15 min ago
Job JC-2024-1008 completed successfully
22 min ago
New order received from Indo German Tools
35 min ago
Payment ₹2.4L received from Apex Panel Works
3 hrs ago
2
Critical
6
High
13
Open
2
Resolved
All Alerts
AI Insights
High Open
ago ·
Critical Open
ago ·
Critical Open
ago ·
High Open
ago ·
High Open
ago ·
Medium Open
ago ·
High Open
ago ·
Medium Acknowledged
ago ·
Medium Open
ago ·
High Open
ago ·
Medium Open
ago ·
Medium Open
ago ·
High Open
ago ·
Low Acknowledged
ago ·
Low Open
ago ·

3 orders at high delay risk

Orders SO-2024-0012, SO-2024-0034, SO-2024-0056 are at risk due to machine overload on CNC Laser and material shortage of CR Sheet 1.6mm. Recommend immediate material procurement and overtime scheduling.

Customer credit risk detected

RK Industrial Components has ₹4.20L overdue while 2 new jobs worth ₹3.8L are being planned. Consider dispatch hold or advance payment collection before releasing new production.

Welding rejection spike - 18% increase

Rejection in welding stage rose 18% this week. Root cause analysis suggests MIG wire batch quality issue from Om Welding Consumables (Lot #WC-2024-087). 3 job cards affected.

CNC-03 recurring downtime pattern

CNC Milling Center (CNC-02) had 4 unplanned downtime incidents in 7 days. Spindle bearing temperature readings trending upward. Recommend preventive replacement before major failure.

CR Sheet 2mm may hit zero in 3 days

Based on current production consumption rate of 180 kg/day and pending orders, MS Sheet 2mm (MAT001) will drop below safe stock in 3 days. Current stock: 2,450 kg, Reserved: 380 kg, Daily usage: 180 kg.

Top 3 profitable products identified

Electrical Panel Box 600x400 (23% margin), SS Hopper 500L (19% margin), and Hydraulic Tank 200L (17% margin) are your most profitable products this quarter. Consider prioritizing these in production planning.

Vendor delivery performance drop

Bharat Fasteners Ltd delivery performance dropped to 62% on-time from 85% last quarter. 4 pending POs currently delayed. Consider alternative vendor evaluation for critical fasteners.

Welding station bottleneck detected

Welding stations WLD-01 and WLD-02 are running at 92% and 85% utilization. 12 job cards queued for welding with average wait time of 2.3 days. Consider adding overtime shift or subcontracting welding work.