Drawings & Documents
10
Total Documents
5
Drawings
3
SOPs & Process Sheets
2
BOMs & Checklists
| Doc ID | Name | Type | Category | Revision | Size | Uploaded | By | Linked Order | Actions |
|---|---|---|---|---|---|---|---|---|---|
| DRG-2024-001 |
Panel Box 600x400 - Assembly Drawing
|
Drawing | Fabrication | Rev 3 | 2.4 MB | 05 Dec 2024 | Design Team | SO-2024-0012 |
|
| DRG-2024-002 |
Control Panel Enclosure 800x600
|
Drawing | Electrical | Rev 2 | 3.1 MB | 03 Dec 2024 | Design Team | SO-2024-0034 |
|
| SOP-2024-001 |
Laser Cutting Procedure
|
SOP | Production | Rev 1 | 1.2 MB | 15 Nov 2024 | QC Team | - |
|
| SOP-2024-002 |
Welding Quality Standards
|
SOP | Quality | Rev 4 | 890 KB | 20 Nov 2024 | QC Team | - |
|
| DRG-2024-003 |
MS Frame Assembly - Custom
|
Drawing | Fabrication | Rev 1 | 4.8 MB | 01 Dec 2024 | CAD Operator | SO-2024-0056 |
|
| BOM-2024-001 |
BOM - Panel Box 600x400
|
BOM | Planning | Rev 3 | 420 KB | 05 Dec 2024 | Planner | SO-2024-0012 |
|
| DRG-2024-004 |
SS Hopper 500L - Fabrication Drawing
|
Drawing | SS Fabrication | Rev 2 | 5.2 MB | 28 Nov 2024 | Design Team | SO-2024-0078 |
|
| QC-DOC-001 |
Inspection Checklist - Panel Box
|
Checklist | Quality | Rev 1 | 380 KB | 10 Nov 2024 | QC Team | - |
|
| SOP-2024-003 |
Powder Coating Process Sheet
|
Process Sheet | Surface Treatment | Rev 2 | 650 KB | 12 Nov 2024 | Production | - |
|
| DRG-2024-005 |
Hydraulic Tank 200L
|
Drawing | Fabrication | Rev 1 | 3.6 MB | 25 Nov 2024 | Design Team | SO-2024-0089 |
|