Plant 1 - Bhosari, Pune

Notifications

View All
Band Saw Machine reported breakdown
2 min ago
CR Sheet 1.6mm below minimum stock
15 min ago
Job JC-2024-1008 completed successfully
22 min ago
New order received from Indo German Tools
35 min ago
Payment ₹2.4L received from Apex Panel Works
3 hrs ago
Customer
Siddhi Vinayak Engg
Outstanding: ₹478,000
Product
Crane Hook Assembly
109 piece @ ₹2,192
Order Value
₹238,928
GST Extra
Status & Priority
QC Pending Urgent
Due: 2024-07-10
Timeline & Progress
Line Items & BOM
Job Cards
Material Status
Quality
Dispatch
Notes & History
Order Progress
Completion: 100% 109 / 109 piece
Order Confirmed
Planning Complete
Material Reserved
Production Started
Cutting
Welding/Assembly
Surface Treatment
QC Inspection
Packing
Dispatch
Order Timeline
2024-06-10
Order confirmed by customer
Admin
2024-06-10
Material reservation requested
Planner
+2 days
Job cards created - 6 operations planned
Planner
+3 days
Production started - Cutting operation
Mahesh Dolas (Supervisor)
+5 days
Material shortage alert - CR Sheet 1.6mm low stock
System
+7 days
Welding operation started
Manoj Gavhane
Line Items & BOM
#ItemQtyUOMRateAmountRemarks
1Crane Hook Assembly109piece₹2,192₹238,928-
Linked Job Cards
Job CardOperationMachineOperatorPlannedActualRejectedStatusActions
JC-2024-0841 Surface Prep DRL-01 Dinesh Sonavane 165 0 0 Not Started
JC-2024-0891 Surface Prep PP-01 Kiran Awate 107 59 1 In Progress
JC-2024-0926 Packing HP-01 Amol Shirke 48 48 3 Rework
Material Requirement & Status
MaterialRequiredReservedIssuedAvailableStatus
MS Sheet 2mm450 kg380 kg280 kg2,070 kgOK
MS Angle 50x50x5120 kg120 kg80 kg1,160 kgOK
CR Sheet 1.6mm200 kg200 kg50 kg120 kgShort
Welding Rod 601315 kg0 kg8 kg125 kgOK
Hex Bolt M10x40120 pcs120 pcs0 pcs2,050 pcsOK
Primer Red Oxide8 ltr5 ltr0 ltr50 ltrOK
Quality Inspection Results
QC IDOperationInspectedPassedFailedResultInspector
QC-2024-0071Cutting50491PassAmol Shirke
QC-2024-0072Welding45423ConditionalPrashant Bhor
Dispatch Status

No dispatches yet

Order needs to complete QC before dispatch can be created.

Notes & Remarks
2024-06-10
Customer requested powder coating in RAL 7035 grey colour. Surface finish must be smooth.
Sales Team
+3 days
Drawing revision 3 received from customer. Updated dimensions on side panel.
Design Team